Petrophysic-Consultants
Geosystems Engineering
THE EXPLORATION PHASE PROJECT PLAN PROJECT PLAN Petrophysic-Consultants plans the operative phase of the Drilling Project in close cooperation with the Directional Drilling company to assist the engineers to plan the right Directional Program to reach the Exploration Target. INTEGRATED FORMATION EVALUATION Formation Evaluation in RealTime during the Exploration Phase is the most important step to garantee a successful project performance. Petrophysic-Consultants are also in this phase present with their 25 years experience to integrate all the data from the Drilling Dynamics Evaluation, the RealTime Measurements as LWD and LWD, Mud Logging Data, Cutting Analysis and Gas Chromatographic Analysis. EXPLORATION PHASE Drilling Dynamics is a direct RealTime method which can be correlated with the Rock Mechanics of the drilled Formation. Through the normalization of the Surface Drilling Parameters a direct correlation can be made with the Static and Dynamic Geomechanical Properties. Petrophysic-Consultants has the experience and the Know-How in the RealTime monitoring of the Drilling Dynamics for improving the project performance. |
|
|